- Purchase products
- Buyers of operation
- Buyer country
- Updated
- 带混凝土搅拌车,特殊用途车辆
- 带混凝土搅拌车,特殊用途车辆
- 加拿大
- 2011-12-20

- 泥瓦建筑承包商用设备,泥瓦建筑承包商用品
- 泥瓦建筑承包商用设备,泥瓦建筑承包商用品
- 美国
- 2011-12-29

- 混凝土制品,化粪池,化粪装置
- 混凝土制品,化粪池,化粪装置
- 美国
- 2011-11-20

- 混凝土养护材料,魂泥土处理材料
- 混凝土养护材料,魂泥土处理材料
- 美国
- 2011-11-12

- 混凝土结构模板,混凝土结构模板附件
- 混凝土结构模板,混凝土结构模板附件
- 美国
- 2012-01-26

- Description of imported goods
- Quantity
- Weight
- Prices of imported goods
- Country/Region
- Arrival Date
- GLUE, ANIMAL,INCLUDING CASEIN CHEMICALS - PACKAGES CONTAINING 72 STEEL DRUMGLUE, ANIMAL,INCLUDING CASEIN S OF 20 KG ADHESIVE G3000 HS CODE 3506 NET WGLUE, ANIMAL,INCLUDING CASEIN EIGHT 1,440 KG II, ADR CONDUMEX P/O 153904 GLUE, ANIMAL,INCLUDING CASEIN CHEMICALS - PACKAGES M38903 SEALING GASKETS GLUE, ANIMAL,INCLUDING CASEIN FOR CONCRETE SEGMENTS HS CODE 4016 NET WEIGGLUE, ANIMAL,INCLUDING CASEIN H
- 54/PKG
- 13087/KG
- Online customer service
- GERMANY
- 2010-7-17

- CONCRETE PAVERS,FINISHERS,&SPR MSKU2449280 20/DRY 86 SHIPPE RS SEAL 8962844 23 PACKAGE GROSS WEIGHT 21080 KGS MEASUR EMENT 18.2 CBM RIGGING HAR DWARE 23PKGS=23PLTS SCAC BANQ HB/LTAO2169983 NAMED ACCOUNT PRINCESS AUTO HS NO 73269090 MARKS AND NUM BERS 246483-00 C2010122 VANCOUVER NO.1-23 395 51_CANADA
- 23/PACKA
- 46473/LB
- Online customer service
- CHINA
- 2010-7-19

- INFLATABLE TOY BALLS, BALLOONS 830 PACKAGES TRAILER ACCESSORIES SAWING BLADE AIR IMPACT WRENCH AIR TOOLS SPRAY GUN RATCHET STRAPS CONCRETE VIBRATOR CONCRETE CUTTER JACK HAMMER RAMMER DIAMOND CORE DRILL PLATE COMPACTOR CONCRETE CUTTER SAW ENGINE NO SWPM AMS INFORMATION WILL BE FILLED BY HECNY SCACHYSL SQ NOUS-CHIW-10-0349-HK2010-005 10-0349G USING GROUP 1 AP CODEHK08735
- 830/PCS
- 17653/KG
- Online customer service
- CHINA
- 2010-7-19

- TRAILER ACCESSORIES SAWING BLADE AIR IMPACT WRENCH AIR TOOLS SPRAY GUN RATCHET STRAPS CONCRETE VIBRATOR CONCRETE CUTTER JACK HAMMER RAMMER DIAMOND CORE DRILL PLATE COMPACTOR CONCRETE CUTTER SAW ENGINE
- 830/PKG
- 17653/KG
- Online customer service
- CHINA
- 2010-7-19

- CONCRETE PUMPS 72 UNITS ON 12 PALLETS CONTAINING WATER PUMPS AS MANIFESTED ON INVOICE SYL-2010 0334 RE. 10 0841900-001 002 DDE.2100639512 1 NCM 8413.70.90 FREIGHT COLLECT HBL POA55510288 SHIPPED ON BOARD SPA CTA1PAV201000238
- 72/PCS
- 7835/KG
- Online customer service
- BRAZIL
- 2010-7-18

- CONCRETE PAVERS,FINISHERS,&SPR MSKU7859858 20/DRY 86 SHIPPE RS SEAL 8973118 500 PACKAGE GROSS WEIGHT 9900 KGS MEASUR EMENT 27.52 CBM TOWING ACC ESSORIES P.O.NO.249267-00, 247538-00P NAMED ACC OUNT PRINCESS AUTO SCAC BANQ HB/LTAO2169574 HS NO 87082990 MARKS AND NUMBERS N/M 39551_CANADA
- 500/PACKA
- 21825/LB
- Online customer service
- CHINA
- 2010-7-19

- CONCRETE PAVERS,FINISHERS,&SPR BRAKE ROTORS 6814 PCS
- 6814/CARTO
- 85170/LB
- Online customer service
- CHINA
- 2010-7-19

- CONCRETE MIXERS 5 PIECES 18 PACKAGES 2 CARTONCONCRETE MIXERS HTS 8479
- 26/PKG
- 7231/KG
- Online customer service
- ITALY
- 2010-7-19

- 38 PACKAGES WITH 168.200 SACKS 16.939 N.W. 19.265 G.W. MULTIWALL PAPER SACKS FREIGHT PREPAID DOOR DELIVERY CORNICK CONCRETE PRODUCTS 11150 GARMAN RD, PEKIN, ILLINOIS 61554, USA NE 1124107
- 38/PKG
- 19265/KG
- Online customer service
- CHILE
- 2010-7-19

- CONCRETE PAVERS,FINISHERS,&SPR PONU1427482 40/DRY 86 SHIPPE RS SEAL CN6606257 1116 CART ON GROSS WEIGHT 6883 KGS MEAS UREMENT 40.64 CBM STILETTO 2 AND VEHICLE KIT ADAPTOR RECEIVER VEHICLE KIT HS 8529109090 HS 8504409990 HS NO 8529109090 MARKS AND NUMBERS NO MARK TTNU3918 472 20/DRY 86 SHIPPERS SEAL CN7980631 334 CARTON GROSS WEIGHT 2943 KGS MEASUREMENT 21.4 CBM STILETTO 2 AND VEH ICLE KIT HS 85291
- 1450/CARTO
- 21662/LB
- Online customer service
- CHINA
- 2010-7-19

- CONCRETE PAVERS,FINISHERS,&SPR MSKU6852503 40/DRY 86 SHIPPE RS SEAL 8015551 74 PACKAGE GROSS WEIGHT 12804 KGS MEASUR EMENT 34.729 CBM SPEED RED UCER 84834090 HS NO 848 34090 MARKS AND NUMBERS N O MARK 39551_CANADA AUTO NO VCC SHIPMENT HOUSE B/L FILLED BY KN HOUSE B/L#4351-0346-00 6.086
- 74/PACKA
- 28227/LB
- Online customer service
- CHINA
- 2010-7-19

- CONCRETE PAVERS,FINISHERS,&SPR K.D.PARTS AND ACCESSORY S/C NO.350440
- 741/CARTO
- 18739/LB
- Online customer service
- CHINA
- 2010-7-19

- CONCRETE GRINDING DIS C
- 1/PKG
- 920/KG
- Online customer service
- HONG KONG
- 2010-7-19

- CONCRETE PAVERS,FINISHERS,&SPR TCLU5542229 40/DRY 96 SHIPPE RS SEAL CN7988905 410 CARTO N GROSS WEIGHT 7770 KGS MEASU REMENT 71 CBM PATIO HEATER HS 73218100 HS NO 7321 8100 MARKS AND NUMBERS NO MARK 39551_CANADA AUTO NVO CC SHIPMENT HOUSE B/L FILLED BY KN HOUSE B/L#4351-0342-006 .078
- 410/CARTO
- 17129/LB
- Online customer service
- CHINA
- 2010-7-19

- CONCRETE PAVERS,FINISHERS,&SPR K.D.PARTS AND ACCESSORY
- 741/CARTO
- 18739/LB
- Online customer service
- CHINA
- 2010-7-19

- CONCRETE PAVERS,FINISHERS,&SPR MSKU6334090 40/DRY 86 SHIPPE RS SEAL CN8009641 26 PACKAG E GROSS WEIGHT 15295 KGS MEAS UREMENT 29.766 CBM COMPRES SOR PUMP 8414809090 HS N O 8414809090 MARKS AND NUMBE RS NO MARK 39551 AUTO N VOCC SHIPMENT HOUSE B/L FILLE D BY KN HOUSE B/L#4351-0347-0 06.019
- 26/PACKA
- 33719/LB
- Online customer service
- CHINA
- 2010-7-19

- ANCHOR BOLT
- 2144/CTN
- 20329/KG
- Online customer service
- FINLAND
- 2010-7-18

- WIRE LOOP TIES
- 1472/PKG
- 12004/KG
- Online customer service
- FINLAND
- 2010-7-18

- INJ/COMPRESS MOLD F/MINERALMA THE PATTERN OF CONCRETE PIPE NOZZLE
- 42/PKG
- 27470/KG
- Online customer service
- CHINA
- 2010-7-18

- 1X20 SWLAC CONTAINER VALVE
- 1/CTN
- 45/KG
- Online customer service
- BAHAMAS
- 2010-7-19

- Product Inquiry
- Inquiry Content
- Country Inquiry
- Updated
- Steel Silo with Concrete Foundation
- Dear Sir We need to have your cataloge and a price list for Syria. Thank you
- United States of America
- 2011-12-19

- Steel Wire And Steel Strand For Prestressed Concrete
- Please quote us CIF Bilbao (SPAIN) for 1 container (24 tons) of 4 mm Low Relaxation PC Wire. Indented surface. Our email address = demetal@terra.es.
- Spain
- 2011-12-01

- HY-QT 4-25 concrete brick making machine
- I would like to know more about the advantages of the machine
- Uganda
- 2012-01-25

- Arix diamond saw blades
- Hi, my name is cronan garry, we have a concrete saw cutting company in ireland and we use arix blades and they are by far the best around. We have one problem the company supplying the blades in ireland are not very reliable and we need to be able to get these blades when we need them. can you help us, is there any other way we can get them in??
- Ireland
- 2011-11-27

- Digital Display Ultrasonic Nebulizer
- Cost of Ultrasonic Pulse Velocity Meter ,Payment and shipping Terms conditions
- India
- 2012-01-15

- Concrete Test Hammer (HT-225A)
- Hi, I have a concrete test hammer produced by you and i bought it from a german reseller. Actually, i\'m in Italy and i have no conversion table to convert rebounds to uniaxial compressive strenght. Could you be so kind to send to my e-mail address a copy of the \"operating manual\" or something helpfull to interpretate HT-225 - Test Hammer rebound results. Thank you in advance. Stefano Albanese
- Italy
- 2012-01-05

- Planetary Grinder GE-520E
- We would like you to quote the supply of 240 volt floor grinder. Industrial Vacuum Cleaner - Please also include grinding discs 30/40 grit and 120 grit discs (metal bond) - we will mainly use to grind/polish concrete (polyurethane finish). Also please quote for supply of resin bond grinding pads from 100 grit through to 3000 grit. We are not familiar with type of machine (in its use). Please provide detail of what would be the best pads/discs for polishing concrete if that differs from what we have mentioned above. We have other product coming from shanghai to be shipped soon would like to include this as part of shipment
- Australia
- 2011-12-08

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-11-07

- Pelton Turbine
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-12-19

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-11-18

- KUCUKOGLU MACHINE CO.// TURKEY// light construction machine
- Dear Sir ; We are as KUCUKOGLU MACINE CO LDT located at Capital IZMIR -Turkey, are one of the biggest manufacturer & best known, leading company on THE LIGHT CONSTRUCTION MACHINERY. Kucukoglu Machıne Co. would like to cooperate with esteemed companies which will buy and need for our light construction machines. We need to expand our working range to reach to more clients and also importers all over the world. Please view and investigate our products on our web site by using www.kucukoglumakine.com . Our main manufacturing items are: • Vibration Road Rollers. • Plate Compactors. • Power Trowel (Concrete Polishing Machines). • Asphalt & Concrete Cutting Machines. • Grass Rollers. We are also dealing with selling: • Concrete Block Making Machines. • Iron Cutting Machines. • Iron Bending Machines. • Discharging Pumps. • Concrete Vibrators. • Concrete Mixers. • Generators. We manufacture the best light construction products on reliable and attractive prices with a high experience & skilled technical team. All our products are new. You will get benefits from our products with best performence level. Please feel free to contact us for any of your requirement if you have activities on this field and looking forward to receive your esteemed instructions. If you want to order for your any requirement or take more information, you can contact with us by this adresses .
- Turkey
- 2011-11-08

- Concrete Mixing Truck
- want to purchase one unit of concrete mixing truck pls reply in below mentioned e mail address with the cataloge with the price in INR Or US$ Regards Akhil Dhelia
- 2011-12-19

- Sell 50 Lb Block Ice Machine
- Dear sir we have concrete batch plant with 120/H M3 and we are looking for flack ice plant qoutation thanks
- 2012-01-30

- Concrete Pump Cleaning Sponge Balls
- We are interested in Sponge Balls for Concrete Pumps for size 5\" & 6\". Medium & Medium Soft grades Please quote your lowest rates and mail us your product catalogs on sip@rediffmail.com. Best regards, Sunil Toshniwal
- 2012-01-05

- Concrete Mixer (js500)-construction Machine-block Brick Machine
- Hi this is suneel i want to know the cost of cement bricks manfactering machine.please give me the contact details.. Thanks
- India
- 2011-12-07

- Concrete Block Making Machinery
- I\'m interested to know a rough price quote for a new clay brick making production line which include brick preparing machines, brick moulding machines, brick drying machines, brick firing machine and loading and unloading equipments. Thank you. Harry Koh
- Malaysia
- 2011-12-22

- Concrete Mixer (js500)-construction Machine-block Brick Machine
- could you pls give us your best prices for brick double elephant machine ....what about firing kiln isit with or without kiln khartoum-sudan Eng.taher
- United States of America
- 2011-11-10

- Concrete Mixer (js500)-construction Machine-block Brick Machine
- Please send price on adobe brick making machine. Thanks
- United States of America
- 2011-12-17

- KUCUKOGLU MACHINE CO.// TURKEY// light construction machine
- Dear Sir ; We are as KUCUKOGLU MACINE CO LDT located at Capital IZMIR -Turkey, are one of the biggest manufacturer & best known, leading company on THE LIGHT CONSTRUCTION MACHINERY. Kucukoglu Mach?ne Co. would like to cooperate with esteemed companies which will buy and need for our light construction machines. We need to expand our working range to reach to more clients and also importers all over the world. Please view and investigate our products on our web site by using www.kucukoglumakine.com . Our main manufacturing items are: • Vibration Road Rollers. • Plate Compactors. • Power Trowel (Concrete Polishing Machines). • Asphalt & Concrete Cutting Machines. • Grass Rollers. We are also dealing with selling: • Concrete Block Making Machines. • Iron Cutting Machines. • Iron Bending Machines. • Discharging Pumps. • Concrete Vibrators. • Concrete Mixers. • Generators. We manufacture the best light construction products on reliable and attractive prices with a high experience & skilled technical team. All our products are new. You will get benefits from our products with best performence level. Please feel free to contact us for any of your requirement if you have activities on this field and looking forward to receive your esteemed instructions. If you want to order for your any requirement or take more information, you can contact with us by this adresses .
- Turkey
- 2011-11-11

- gps/gsm antenna
- Hi, We are an italian company focus on renewable energy, most of all photovoltaic. So for photovoltaics ground installation we\'re thinking about screw, no digg, no concrete, no mess, much friendly and easy. I\'d like to know much infos about your ground screw line. What has been chosen for the surface treatment? iron, zinc, or other? Can You send me a some infos and/or a catalog for models, sizes and prices. Best Regards, Gianluca Sampaolesi Securmate srl Italy
- United States of America
- 2011-12-01

- Name of trade enterprises
- Industry trade enterprises
- Contact
- Updated
- hengxinyuan hardware company
- 冶金矿产 钢铁
- 2012-01-16

- Pioneer Concrete (Guangzhou)
- 2012-01-19

- Redland Concrete Limited
- 2012-01-03

- QH Concrete Co.Ltd.
- 2011-12-24

- Geotechnics & Concrete Engineering (HK) Ltd.
- 2011-11-14

- Unicon Concrete Products (H.K.) Limited
- 2012-01-03

- Concrete Products (H.K.) Limited
- 2012-01-20

- 郑州革新建筑机械有限公司
- 混凝土搅拌机械; 工程与建筑机械; 起重机; 其他工程与建筑机械;
- 2011-11-09

- Exhibiting Company Name
- Exhibitors of Operation
- Exhibitors country
- Updated
- Pedershaab Concrete Technologies A/S
- 2011-11-18

- Concrete Engineering International
- 2011-12-24

- Concord Concrete Pumps Inc
- 2012-01-08

- World of Concrete/Hanley Wood Exhibitions
- 2011-11-17





