- Purchase products
- Buyers of operation
- Buyer country
- Updated
- 家具家庭用室内家具
- ·Household Electrical Appliances Kitchen Electrical Appliances Refrigerators and Refrigeration Equipment Air Conditioners and Ventilation Equipment Washers and Dryers Other Small Electrical Appliances ·Electronics & IT Products Audio-video Products Comput
- 美国
- 2012-01-29

- 电子及信息产品 计算机网络设备通讯产品电子安全设备 电子电工产品计算机软件其他电子信息产品
- importatio company Hight volume Electronic equipement Computer Peripheral Equipment Other Electronics & IT Products Computers and Fittings Audio-video Products Audio-video Products Electronics & IT Products Electronic and Electrical Products Electronic an
- 法国
- 2012-01-21

- 服装 男装女装专业运动服 休闲运动服制服/工作服其他服装 睡衣及内衣结婚礼服酒会时装/晚装 泳装童装婴儿及孕妇服装 服装面料时装饰品成衣配件 家用电器 其他家用小电器 电子及信息产品 音像视听产品电子安全设备电子电工产品 计算机及配件计算机外围设备计算
- UK Government Department - HM Prison Service (initially) and other UK Govt. Depts to follow. The ranges include: Uniform and Garments. Control & Restraint equipment. Electrical equipment (TVs etc..) are the main spend categories. London 企业性
- 英国
- 2011-12-04

- Electrical conductors
<62> 80 V but <131> 1000 V with connectors, Other knives and cutting blades for machinery or mechanical equipment, and parts, base metal, Parts, except antenna, for transmission, radar, radio, TV, etc., nesoi - Electrical conductors
<62> 80 V but <131> 1000 V with connectors, Other knives and cutting blades for machinery or mechanical equipment, and parts, base metal, Parts, except antenna, for transmission, radar, radio, TV, etc., nesoi - USA
- 2011-12-09

- Machine parts with no electrical features, nesoi, Other knives and cutting blades for machinery or mechanical equipment, and parts, base metal
- Machine parts with no electrical features, nesoi, Other knives and cutting blades for machinery or mechanical equipment, and parts, base metal
- USA
- 2011-12-09

- Gymanasium, or other athletic articles and equipment, and parts, Machine parts with no electrical features, nesoi
- Gymanasium, or other athletic articles and equipment, and parts, Machine parts with no electrical features, nesoi
- USA
- 2012-01-21

- Electrical machines and apparatus, having individual functions, nesoi, Gymanasium, or other athletic articles and equipment, and parts, Taps, cocks, etc., for pipe vats, including thermo control, nesoi
- Electrical machines and apparatus, having individual functions, nesoi, Gymanasium, or other athletic articles and equipment, and parts, Taps, cocks, etc., for pipe vats, including thermo control, nesoi
- USA
- 2012-01-13

- Other ball or roller bearings, including combined ball/roller bearings, Parts and accessories of motor vehicles, nesoi, Parts of electrical ignition or starting equipment; generators and cut-outs
- Other ball or roller bearings, including combined ball/roller bearings, Parts and accessories of motor vehicles, nesoi, Parts of electrical ignition or starting equipment; generators and cut-outs
- USA
- 2012-01-18

- Gymanasium, or other athletic articles and equipment, and parts, Machine parts with no electrical features, nesoi, Machines and mechanical appliances with individual functions, nesoi
- Gymanasium, or other athletic articles and equipment, and parts, Machine parts with no electrical features, nesoi, Machines and mechanical appliances with individual functions, nesoi
- USA
- 2011-11-28

- Electrical parts of machinery, nesoi, Gymanasium, or other athletic articles and equipment, and parts, Instruments and appliances for medical, surgical, dental and veterinary sciences, nesoi
- Electrical parts of machinery, nesoi, Gymanasium, or other athletic articles and equipment, and parts, Instruments and appliances for medical, surgical, dental and veterinary sciences, nesoi
- USA
- 2012-02-10

- Automatic data processing machines; magnetic reader, etc., Electrical lighting or visual signaling equipment, except for bicycles, Knives having other than fixed blades, and parts except blades
- Automatic data processing machines; magnetic reader, etc., Electrical lighting or visual signaling equipment, except for bicycles, Knives having other than fixed blades, and parts except blades
- USA
- 2012-01-17

- Automatic Paging From Plant Floor - In-plant Wir
- All Other Electrical Equipment and Component Manuf->
- Canada->
- 2012-01-20

- M茅canisme de s茅curit茅 frein d'inertie, op
- All Other Electrical Equipment and Component Manuf->
- Canada->
- 2011-12-09

- Description of imported goods
- Quantity
- Weight
- Prices of imported goods
- Country/Region
- Arrival Date
- PATIO FURNITURE
- 132/CTN
- 3454/KG
- Online customer service
- CHINA
- 2010-4-19

- PATIO FURNITURE
- 132/CTN
- 3454/KG
- Online customer service
- CHINA
- 2010-4-19

- PATIO FURNITURE
- 132/CTN
- 3454/KG
- Online customer service
- CHINA
- 2010-4-19

- PATIO FURNITURE
- 132/CTN
- 3454/KG
- Online customer service
- CHINA
- 2010-4-19

- PATIO FURNITURE
- 223/CTN
- 3447/KG
- Online customer service
- CHINA
- 2010-4-19

- LIGHTING EQUIPMENT, OTHER ELECTRICAL EQUIPMENT, NOS LIGHTING EQUIPMENT, OTHER ELECTRICAL MATERIAL
- 8/PCS
- 2331/KG
- Online customer service
- ITALY
- 2010-4-19

- LIGHTING EQUIPMENT, OTHER ELECTRICAL LIGHTING EQUIPMENT, OTHER INV. 2010511678 LIGHTING EQUIPMENT, OTHER ELECTRICAL MATERIAL LIGHTING EQUIPMENT, OTHER HS 8585 LIGHTING EQUIPMENT, OTHER REF. 787788
- 1/PCS
- 198/KG
- Online customer service
- ITALY
- 2010-4-19

- ELECTRICAL LIGHTING OR VISUAL SIGNALLING EQUIPMENT - PACKAGE (S) MOTOR CAR ACCESSORIES 33 PACKAGES MOTOR CAR ACCESSORIES INVOICE 94689 746,94689748 HS-CODE 85122000,85439000 === MSCU 778 222 7 === === SEAL 004921 === STOPPERS, LIDS, CAPS AND OTHER CLOSURES, OF P LASTI - PACKAGE (S) MOTOR CAR ACCESSORIES 1 PACKAGE MOTOR CAR ACCESSORIES INVOICE 5023517HS-CODE 39235090 === MSCU 778 222 7 === === SEAL
- 42/PKG
- 5949/KG
- Online customer service
- GERMANY
- 2010-4-23

- RHEOSTAT & RESIST MOTOR STRTER ELECTRICAL VARIABLE RESISTORS, INCL. RHEOSTATRHEOSTAT & RESIST MOTOR STRTER S AND - CARTON . AUTOMOTIVE EQUIPMENT INDUCTORS, OTHER INDUCTORS (EXCL. INDUCTORS FOR DISCHARGE LAMP INDUCTORS, OTHER S OR - CARTON AUTOMOTIVE EQUIPMENT OTHER NONTHREADED ART. OF I/S NON-THREADED ARTICLES, OF IRON OR STEEL - CAROTHER NONTHREADED ART. OF I/S TON AUTOMOTIVE EQUIPMENT SELF-TAPPI
- 46/PKG
- 3906/KG
- Online customer service
- GERMANY
- 2010-4-30

- OTHER NONTHREADED ART. OF I/S NON-THREADED ARTICLES, OF IRON OR STEEL - CAROTHER NONTHREADED ART. OF I/S TON AUTOMOTIVE EQUIPMENT RHEOSTAT & RESIST MOTOR STRTER ELECTRICAL VARIABLE RESISTORS, INCL. RHEOSTAT RHEOSTAT & RESIST MOTOR STRTER S AND - CARTON . AUTOMOTIVE EQUIPMENT INDUCTORS, OTHER INDUCTORS (EXCL. INDUCTORS FOR DISCHARGE LAMPINDUCTORS, OTHER S OR - CARTON AUTOMOTIVE EQUIPMENT PLASTICS,B
- 215/CTN
- 3335/KG
- Online customer service
- GERMANY
- 2010-5-29

- MAGNESIUM ART, OTHER, NSPF PRESSURE REGULATOR FOR COMPRESSED AIR RUBBER SKIN WITH DOFFED SURFACE DIRETION SWITCH FOR CONVEYOR POUCH EMPTY WOODEN BOX WOODEN DISPLAY, CABLE, ATENOLOL USP, HOSPITAL ICE BED, MACHINE CONSUMABLE KING TONY PROFESSIONAL TOOLS, PVC VALVE & FITTING RUBBER GASKET, ALUM. TUBE, SUNWHITE BYLK CONC. SUNWHITE BYX, ELECTRIC EQUIPMENT, AUTO ELECTRICAL PARTS, TENT X-BANNER PLACARD,
- 470/CTNS
- 15146/KG
- Online customer service
- PANAMA
- 2010-5-7

- MAGNESIUM ART, OTHER, NSPF PRESSURE REGULATOR FOR COMPRESSED AIR RUBBER SKIN WITH DOFFED SURFACE DIRETION SWITCH FOR CONVEYOR POUCH EMPTY WOODEN BOX WOODEN DISPLAY, CABLE, ATENOLOL USP, HOSPITAL ICE BED, MACHINE CONSUMABLE KING TONY PROFESSIONAL TOOLS, PVC VALVE & FITTING RUBBER GASKET, ALUM. TUBE, SUNWHITE BYLK CONC. SUNWHITE BYX, ELECTRIC EQUIPMENT 85.44.49.40, AUTO ELECTRICAL PARTS 84.04.20.00
- 394/CTNS
- 14788/KG
- Online customer service
- PANAMA
- 2010-5-7

- FAB,TEXT,LAMNTD,NT 9,SCT XI,MM SUNSCREEN EQUIPMENT HS CODE 7019.5900 5907.0090 CAN OPENERS (INC COMBINATIONS) ELECTRICAL HOUSEHOLD GOODS HS CODE 85098000 MCH PRT F/8471,N/CATH,PRNTCRCT COMPUTER PARTS HS CODE 8473.3051 LOADED ON 5 PALLETS CASTILE SOAP,ORGANC,TOILET USE COMPUTER PARTS HS CODE 8504318090 CERAMIC,GLAZED,OTHER CARPET TILES HS CODE 69089093 00 4099 ELEC SOUND AMPLIFIER SETS SOUND AMP HS
- 1149/PKG
- 19418/KG
- Online customer service
- NETHERLANDS
- 2010-5-14

- BOARDS, PANELS, ETC PARTS BOARDS, PANELS, CONSOLES, DESKS, CABINETS ANDBOARDS, PANELS, ETC PARTS OTHE - CARTON AUTOMOTIVE EQUIPMENT PLASTICS,BUCKETS AND PAILS ARTICLES OF PLASTICS AND ARTICLES OF OTHER MA PLASTICS,BUCKETS AND PAILS TERIA - CARTON AUTOMOTIVE EQUIPMENT ELEC MACH,PARTS,PHYSICAL VAPOR PARTS OF ELECTRICAL MACHINES AND APPARATUS, HELEC MACH,PARTS,PHYSICAL VAPOR AVING - CARTON . AUTOMOTI
- 332/PKG
- 3939/KG
- Online customer service
- GERMANY
- 2010-5-16

- RHEOSTAT & RESIST MOTOR STRTER ELECTRICAL VARIABLE RESISTORS, INCL. RHEOSTATRHEOSTAT & RESIST MOTOR STRTER S AND - CARTON . AUTOMOTIVE EQUIPMENT INDUCTORS, OTHER INDUCTORS (EXCL. INDUCTORS FOR DISCHARGE LAMP INDUCTORS, OTHER S OR - CARTON AUTOMOTIVE EQUIPMENT BOARDS, PANELS, ETC PARTS BOARDS, PANELS, CONSOLES, DESKS, CABINETS ANDBOARDS, PANELS, ETC PARTS OTHE - CARTON AUTOMOTIVE EQUIPMENT SWITCHGE
- 150/CTN
- 3192/KG
- Online customer service
- GERMANY
- 2010-5-21

- TEXTBOOKS PACKAGES BOOKS IN RETURN TEXTBOOKS CASES BOOKS IN RETURN INDUCTORS, OTHER CASES ELECTRICAL EQUIPMENT ELECTRONIC INDUCTORS, OTHER INDUCTORS SEAMLESS/REF CPR,TUBES/PIPES PACKAGE SILVER BEARING COPPER TUBE MACHINERY PTS OF CONVEY/ELEV CASES TAIL WHEEL AND DRIVE SHAFT DUST COLLECT & AIR PURIF EQU PACKAGES CATALYTIC CONVERTERS CAST-IRON PARTS F/MACH IN 8465 PACKAGES MONITORS
- 24/PCS
- 14298/KG
- Online customer service
- SWEDEN
- 2010-5-24

- PATIO FURNITURE
- 128/CTN
- 3326/KG
- Online customer service
- CHINA
- 2010-5-30

- OTHER AXLES AXLES, FOR ELECTRICAL PURPOSES, AND WHEELS ANOTHER AXLES D PAR - / PALLETS OF RAILWAY EQUIPMENT L.O.14OTHER AXLES 695 - LOTE 4 CAED# 01I557SC168520100500116
- 17/PKG
- 20650/KG
- Online customer service
- BAHAMAS
- 2010-6-19

- CONDUCTOR W/CONNECTOR <=80V ELECTRIC CONDUCTORS FOR A VOLTAGE <= 80 V, INCONDUCTOR W/CONNECTOR <=80V SULAT - CARTON AUTOMOTIVE EQUIPMENT INDUCTORS, OTHER INDUCTORS (EXCL. INDUCTORS FOR DISCHARGE LAMP INDUCTORS, OTHER S OR - CARTON AUTOMOTIVE EQUIPMENT RHEOSTAT & RESIST MOTOR STRTER ELECTRICAL VARIABLE RESISTORS, INCL. RHEOSTATRHEOSTAT & RESIST MOTOR STRTER S AND - CARTON . AUTOMOTIVE EQUIPMENT SEL
- 68/CTN
- 2370/KG
- Online customer service
- GERMANY
- 2010-7-9

- OTHER NONTHREADED ART. OF I/S NON-THREADED ARTICLES, OF IRON OR STEEL - CAROTHER NONTHREADED ART. OF I/S TON AUTOMOTIVE EQUIPMENT GLS STRPS N/OVER 15.2CM SHEETS OR PROFILES OF GLASS, WHETHER OR NOT H GLS STRPS N/OVER 15.2CM AVING - CARTON AUTOMOTIVE EQUIPMENT RHEOSTAT & RESIST MOTOR STRTER ELECTRICAL VARIABLE RESISTORS, INCL. RHEOSTATRHEOSTAT & RESIST MOTOR STRTER S AND - CARTON . AUTOMOTIVE EQUIP
- 104/CTN
- 3178/KG
- Online customer service
- GERMANY
- 2010-7-17

- Product Inquiry
- Inquiry Content
- Country Inquiry
- Updated
- Pelton Turbine
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2012-02-05

- Voltage Stabilizer
- USAMA HARRIS KHAN & COMPANY Exporters, Manufacturers of Tractors, Agricultural Machinery, Agricultural & Sea Products Plot # 27, Sector 15, Korangi Industrial Area, P. O. Box # 8220, Karachi-74900, Pakistan Phones: +9221-5053243, 5053244, 5068674, CELL; - 0092-302-8222444 Fax: +9221-5068104, Email: usamaniazi@hotmail.com Email: usamaniazi@yahoo.co.uk Dated: 18-08-2008 Ref: UHK786-M/EXPT-001 Dear Sir, Subject: Chromite, Granite, Iron Ore, Coal, & Other Minerals of Pakistan available for Export Attn: Import Director We take the pleasure to introduce ourselves as one of the leading stockiest and exporters of Raw Chromite, Granite, Iron Ore, & other Minerals of Pakistan with the following specifications:
- Palestine
- 2011-12-31

- Molded Case Circuit Breaker (MCCB)
- Low Voltage Switchboard: 1. Requirements for design, materials, construction, tests, and technical documentation of switchboard shall be as per IEC standard and other recommendations. Switchboard shall be metal-clad, draw out switchboard of rating voltage 0.4 KV 3- ph+N system, 50 HZ, continuous duty. 2. The new switchboards shall be completed with necessary components, as indicating instruments, electric protective relays, current transformers, voltage transformers, ammeters, selector switches, KWH meters, indicating lamps (LED TYPPES), TERMINALS, FUSES, CONTROL DEVICES, AND FUSE LINKS ETC. All components shall be (latest applicable technology). 3. Auto transfer system between feeders is required to assure power continuity, system shall have clear philosophy of operation of auto transfer system. The switch board shall be completed with necessary motorized air circuit breakers in locations where are required at buses, feeders and heavy loads.etc. 4. Switchboard should be divided in units suitable for transport and their reassembly shall be as simple and sure as possible. Switchboard shall be extendable at either end, and have Access from the front and the rear (when necessary). 5. Bus bar shall be hard drawn high conductivity system, made by flat bars of electrolytic copper, and shall have the same rating through out the length of switchgear assembly. 6. All the components of the structure, Equipment, metal partitions, doors and earthing switches shall be connected solidly to the main earthing bar. 7. The Protection System, shall be designed with the latest techniques to provide a complete package for the protection, and shall be of excellent accuracy, high stability y, high immunity to electrical interference, and robust mechanical design. Provided relays shall include but not limited to 26,27,30,50,51,51N,63,86,87,99.etc..
- Libya
- 2011-11-13

- thermosetting powder coating
- Our company SECURE has been in the Security business in Mexico, for the past 15 years, we import and install with our own personnel, among other products, Security Window Laminates, this product has become very important in our line of products. We are importing around 90,000 sq feet per year of film, basically we import the 360 micron type and the 300 micron. We protect Banks, Government Offices, Residential, Airports and Private Sector. As well as police cars, ( on the doors we apply a resins develop by secure ), we have a side line protection, basically focus on hurricane and solar control as well. Please send me specific information on your security film ( Width x Length Per Roll and thickness, If you have a ticker one we are very much willing to see it. ) , Technical Data, prices, delivery times in order for me to analyze it in order to make an appointment to visit you. For your response thanks in advanced, Best Regards Claudio Canavati F. cc@secure.com.mx
- Mexico
- 2012-01-03

- Dust Mask/ Facical Mask/ Folded Mask (DTC3X) Face Mask (Protective Bird Flue-DTC3B)
- Dear sir/madam kindly note we are among the leading private Iranian trading companies . Presently we are planning to purchase influenza n95 and other medical usage mask and other disposable product in 100000 pcs. You are kindly requested to forward your best quotation for above requirement along with the specification and options basis CFR Bandar Abbas /BIK, Iran. Your prompt reply is highly appreciated. Best Regards, Trading Department
- United States of America
- 2011-12-22

- Combined Terminal Block
- Kindly forward the prices and other ancilliary costs for the moulding machine with freight cost to Nigeria.
- South Africa
- 2012-02-06

- DMZX Miniature Electromagnetic Brakes
- Please supply with info about wheelchairs and other equipment for disability you can provide. We are major manufacturer from Serbia (Europe) and looking for Chinese partner. We will be visiting Guangzhou trade fair from 3-6 November and would appreciate meeting if possible. Many thanks for your quick response. Nikola Latinovic, commercial director
- 2011-11-27

- Microfilter
- Dear Madam/ Sir, I\'ve seen your trike on the internet an I would be interested in buying one. Could you send me a list of prices and other models you might have? How do I get to buy a trike from you? Thank you for your time and I am looking forward to hearing from you. Regards, Daniel Dulgheru
- Romania
- 2011-12-19

- Perkins Series Generator Set (24kW/30kVA- 112kW/140kVA)
- I want to know: Price,Specification,Payment,Freight,Sample Terms,Verified Suppliers.From Mr. David Ranti Daramola;-{MD/CEO} R O D. Nigeria Limited 22.Sheriki Aro Avenue Ikeja Lagos State Nigeria DL=Phone +234 80542 56217 Its my intrest to forward this my e-mail to your company, for more information about your Company, and to see how My company can be able to develope a viable and good Business Transaction with your Company, In the area of perkins generators set, Spare parts mostly the Starter Motor assy. and the components also the Alternator assy.12v&24V,etc and the Oil filters & the Fuel Filters,Plus many other items for perkins generators. About ;-R O D. Nigeria Ltd, Is a Registerd Company by the FEDERAL GOVERMENT OF NIGERIA, as an importer & Agents to Manufacture of all kind of Mechanical & Electrical Spare Parts etc, Looking forward to your reply Thanks my best regards David Ranti Daramola MD/CEO} R.O.D.Nigeria LTD email;-rodnigltd@yahoo.com
- Nigeria
- 2012-01-13

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2†dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2†dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table†General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List†shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier†complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG†type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8†Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-12-02

- Dome tent
- Attention CEO With respect my greetings to you and your entire family. I am Retired Army General Abu Balla 51 years old and a citizen of Ghana. Absolutely going through your company profile, i decided to invest in your company or buy your product in a large quantity. I want to deal directly with you because as a retired Army General i would not want eye brow to rise on me by my Government. I have the FUND 13Million US Dollars Cash to invest in your Product. On the ground that you can personal assist me in will give you 30% percentage on my arrival in your country OK. Please my conversation with you should be utmost confidential. In receipt of this mail i will forward to you my International Passport and other information about me. Thanks. Retired General Abu Balla. Email; generalballa@yahoo.com
- Ghana
- 2011-12-04

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2†dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2†dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table†General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List†shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier†complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG†type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8†Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2012-01-31

- MCCB Molded Case Circuit Breaker
- I want to know: Price,Specification,Payment,Freight,Sample Terms,Verified Suppliers Dear Sir/ Madam We at M/s Ankur Agencies, Bangalore (India), are a 30-year-old family business of watches and clocks spare parts traders. With plans to diversify our business, we have made up our mind to deal in a good scale of few products, one of which being Electronic Cigarettes. After reading through your business profile at a website, we would be pleased to require a quotation for buying and reselling Electronic Cigarettes from your good company in India. We request you to give us maximum information possible regarding the product and trading of the same from your end, in additional to the below few queries posted by us. 1-What would be the minimum number of pieces that we would have to purchase per transaction from you? 2-What would be the process of purchase returns of unsold pieces and also damaged/defective pieces? 3-Would you also undertake repairs of the same, if the customer needs it after its use? 4-If we have a plan to sell the products with our own brand, would it be a issue with your concern? What would be the price reduced by you in case we just need the products with out boxes, as the same will be printed here when its sold under our brand name? 5-Do you trade in India as of now? If yes, what is the volume (if you could provide basic details on it)? 6-Modes of payments and other trade discounts of your respective credit and discount periods, shipping charges and other charges? Thanks in advance for a quick and comprehensive response on the above. (Request you to give us as attractive and competitive proposal as possible, to prevent us from visiting other manufacturers) Yours truly, Ashish Tuteja. (On behalf of Ankur Agencies Contact- +91-80-9986640251 Mail Id- ashishttj@yahoo.com)
- India
- 2012-01-14

- Energy Saving Lamps & Other Electrical Accessories
- Helo Dear, I want purchaseelectricity saving box. Can u please tell me the price of electricity saving box. i am from pakistan my detail as under Aamir Naseer Cell# 0092 300 6606715 0092 321 6606715
- Pakistan
- 2011-11-17

- Energy Saving Lamps & Other Electrical Accessories
- Hi, Need about 10 pieces Nany Caps We will provide the materials, design & the cap size. We are based in Hong Kong Regards, Shanker
- Hong Kong
- 2011-12-13

- ELECTRONIC BLOCK KIT Solar Car Kit
- Seeking for your investment assistance urgently please I am James Javier 19 yrs of age from Cote D\'Ivoire.I would like to seek for your assistance,as an investment consultant or perhaps you may have knowledge about profitable investment opportunities.I would be delighted to enter into partnership with you considering your idea after going through your profile.This is because investment in my country is insecure and risky.Very risk, I must confess!! It is very essential you understand the kind of trust and confidence I want to put in you is extraordinary, and as an act of desperation on my part,in order not to lose this of my inherited fund in the hands of the top desparate Government Officials,i have decided to contact you using this means thereby seeking for your assistant in receiving this fund in your custody for an investment in your company or in any other benefiting business in your country which you know better.This fund was inherited from my late father who was killed years ago by Rebels in one of their attack including my mother.My late Father,Mr A Javier, been a highly reputable politician in my country was the prime target.fortunately for me,i was in school during the attack.Please,treat this contact with utmost secrecy for security and safety reasons.I hope to read your posetive response at your earliest convenient. For your kind gesture please contact me with this email address:jamesjavier501@yahoo.fr and this is also my phone contact for more verbal discussion please call me +225 0764 4845.Please i want you to get back to me immediately you receive this message. Waiting to hear from you soonest. Your advice could mean a lot to me Regards James Javier
- Cote dIvoire
- 2012-01-09

- 10kV S9-M series three-phase oil-immersed power transformer 10kV S11-M Series Omniseal Three-phase Oil-immersed Power Transformer Oil-immersed transformer exclusive fo
- Dear sir we are the one of the leading company in Nepal for Government tender Business. our mail line of business is participating different type of Tender called by Government different Department. We have reach experience in bidding tender. Last 10 years we are doing business in different field. For more information please see our Web site www.avashtradelink.com. Nepal Electricity Authority(NEA) is government company they are buying different type of Electrical item. One of them DISTRIBUCTION TEANSFORMER Single phase 15 KVA to 400 KVA and 3 Phase 25 KVA to 300 KVA Quantaty is 1200 no .Every year they buy this Quantity and every year quantity is increased .NEA buy this product by Tender process. They do not buy directly from any company because this is Government Company With our Joint efforts we are able to get business. I have very clause link with Nepal Electricity Authority Chair Person and Technical P EOPLE. ONCE IF YOU GIVE CHANCE TO CO-OPERAT we can arrange business for your company, we will give you all information . In 2008 They buy from PEOPLE ELECTRIC GROUP CHINA If you have interest then I will also come to your office for further discussion. If you have interest to work with us Please inform us we will send you all information and last tender Document for your reference and last tender other information BEST REGARDS BHUPENDRA MAN SINGH MANAGING DIRECTOR AVASH TRADE LINK Tel 977-1-6223491 Fax 014115977 M 977-9841217428 Email avashtradelinbk@gmail.com www.avashtradelink.com
- Nepal
- 2011-12-08

- RSD Composite Insulation Heat Shrinkable Tape
- Low Voltage Switchboard: 1. Requirements for design, materials, construction, tests, and technical documentation of switchboard shall be as per IEC standard and other recommendations. Switchboard shall be metal-clad, draw out switchboard of rating voltage 0.4 KV 3- ph+N system, 50 HZ, continuous duty. 2. The new switchboards shall be completed with necessary components, as indicating instruments, electric protective relays, current transformers, voltage transformers, ammeters, selector switches, KWH meters, indicating lamps (LED TYPPES), TERMINALS, FUSES, CONTROL DEVICES, AND FUSE LINKS ETC. All components shall be (latest applicable technology). 3. Auto transfer system between feeders is required to assure power continuity, system shall have clear philosophy of operation of auto transfer system. The switch board shall be completed with necessary motorized air circuit breakers in locations where are required at buses, feeders and heavy loads.etc. 4. Switchboard should be divided in units suitable for transport and their reassembly shall be as simple and sure as possible. Switchboard shall be extendable at either end, and have Access from the front and the rear (when necessary). 5. Bus bar shall be hard drawn high conductivity system, made by flat bars of electrolytic copper, and shall have the same rating through out the length of switchgear assembly. 6. All the components of the structure, Equipment, metal partitions, doors and earthing switches shall be connected solidly to the main earthing bar. 7. The Protection System, shall be designed with the latest techniques to provide a complete package for the protection, and shall be of excellent accuracy, high stability y, high immunity to electrical interference, and robust mechanical design. Provided relays shall include but not limited to 26,27,30,50,51,51N,63,86,87,99.etc..
- Libya
- 2011-12-23

- LED Flashlight
- Dear Sir, My name is Miss Anishta Crustna, Product Research and Development Officer from Kirsh Co. Ltd, Mauritius. Our company is an importer of agricultural products namely agrochemicals, fertilisers, poultry products and equipment, agricultural machinery, garden tools and pest control products for public utilities. Our aim is to provide new technologies at affordable prices to our agricultural sector. I am presently looking for water soluble N,P,K, fertilisers with composition as follows: 1. N:14%, P2O5: 13%, K2O:13% and microelements: Boron, Copper, Manganese, Molybdenum and Zinc This formulation would be used for flower formation and fruiting in vegetable, fruits. 2. N:8%, P2O5: 6%, K2O:7% and microelements: Boron, Cupper, Manganese, Molybdenum and Zinc This formulation will be used for foliar development in vegetables and ornamentals. I would be grateful if you could please indicate if you could provide them and if yes, please provide me with a quotation for your minimum requirement (CIF, PortLouis). Please also indicate to me the Customs Tariff Code of the fertiliser and the volume that would be occupied by your minimum order for the fertiliser. Please also send me test certificates, MSDS, and other documents you deem important. I await your reply. Thank you. Kind regards. Anishta Crustna
- Mauritius
- 2012-01-18

- BUSINESS PARTNERS
- Dear Sir,
We have received your NAME and address in WORLD DIRECTORY OF TRADE PROMOTION ORGANIZATIONS AND OTHER FOREIGN TRADE BODIES offer by the INTERNATIONAL TRADE CENTER.
Permit us to present to you our company. MILP I.N.C is an IMPORT-EXPORT COMPANY in general merchandises in CAMEROON-AFRICA and our main office is in LOS ANGELES CALIFORNIA - U.S.A.
Our objectives are:
-To bring the foreign MANUFACTURING COMPANY PRODUCTS TO U.S.A AND CAMEROON AFRICAN MARKET. TO BECOME A SALES REPRESENTATIVES,TO PROMOTE THE PRODUCTS,TO ADVERTISE, DISTRIBUTE AND WHOLESALING.
We want to represent to distribute and wholesaling the MANUFACTURING COMPANY PRODUCTS of your CONTRY to U.S.A and AFRICAN MARKET. Introduce us to the MANUFACTURER COMPANY who are looking for relevant overseas business partners.
Please note that for some manufacturing company products in AFRICA, we want also, Unsold, Sale good and Use.
Thank for your king attention and cooperation.
You're faithfully
SAMUEL TCHUNGUI
General Manager
MILP I.N.C.
7075 LANEWOOD AVE.# 22 HOLLYWOOD
CALIFORNIA 90028 U.S.A
PHONE: (323) 509 8380
E-mail: usamilp@yahoo.com
PRODUCT:
-Rice-Dairy produces. -Fresh, processed and canned fish, crustacean and mollusks -Cereals and derived products oilseeds, sugar and by products of the sugar industry -Food for animal and miscellaneous agricultural produces -Processed food products -Beverages -Tobacco -Ores and metals -Mineral products -Ceramics -Glass -Trade in building materials, ceramics and glass -Foundry and metal processing -Metal manufactured goods -General mechanical outfit -Specialized industrial equipment -Machine tools -Farming machines -Handling equipment, equipment for mines, metallurgy, civil and engineering -Data processing and equipment and office machines -Electrical appliances -Professional electronic equipment -Household electronic equipment -Household appliances -Horology, optics, precision and medical equipment -Trade in professional and domestic durable goods -Motorcars, motorcycles and cycles -Pharmacy -Rubber and asbestos industry -Processing of plastics -Textile raw materials -Production of thread, clothe, carpets, lace, etc?-Hosiery and clothes -Paper and cardboard -Essential oils, perfumes, cosmetics -Jewelers, gems goldsmith trade -Miscellaneous industries -Recovery of waste products -Live animals, for slaughter and meat, poultry farming, processed pork and canned meat, slaughtering by-products -Fresh and canned fruit and vegetables, seeds, nursery seedling, flowers and foliage -Hides and leather, morocco goods, footwear.
-----Original Message-----
From: Sourcing Guide (TDC Admin)
Sent: 21 10 2005
Subject: Welcome to sourcing.tdctrade.com
Message:
Mr SAMUEL TCHUNGUI
Welcome to the New World of Business Sourcing
At sourcing.tdctrade.com, we offer:
- Information about more than 17,000 products
- More than 100,000 company profiles
- Easy-to-use features to facilitate your sourcing
Thank you for choosing sourcing.tdctrade.com.
Contact Information:
Company: Sourcing Guide
Contact Person: - 2011-11-20





