- Purchase products
- Buyers of operation
- Buyer country
- Updated
- 电子及信息产品音像视听产品计算机及配件计算机外围设备电子电工产品其他电子信息产品
- Surplus computer products 4-13 3000 x AT PSU 4-13 3000 x AT Power Supplies 4-13 Surplus Stock Lots 4-13 RFQ 3000 x AT PSU 4-13
- 英国
- 2012-01-13

- 食品及茶叶食品 玩具婴儿玩具
- Power Bright Industrial (Hong Kong) Co., Ltd. is a specialized manufacturer of a wide range of plastic products, including home supplies (storage boxes, kitchen utensils, plastic and mental cutlery, baskets, hangers, combs), stationery (stationery ...
- 香港特别行政区
- 2011-11-15

- 医药保健品及医疗器械 中药材/中成药/中药酒医疗器械保健品 保健器械美容美体用品 家用电器 厨房电器其他家用小电器 电子及信息产品 音像视听产品商务自动化设备电子安全设备 电子电工产品 灯具灯饰 电光源灯具其他灯具灯饰制品 机械及设备 摄影器材印刷
- to supplies CCTV camera , DVR system , alarm , automatic gate motor , wire & etc ... bintulu
- 马来西亚
- 2012-01-18

- 电子及信息产品 音像视听产品计算机及配件计算机外围设备 计算机网络设备通讯产品商务自动化设备 电子安全设备电子电工产品计算机软件 其他电子信息产品
- Dear Sirs/Madams, Parsa Electronics Co. founded in 2004 is recognized as the leading professional manufacturer of industrial switching power supplies in Iran. Our products include AC/DC Enclosed Standard Power Supply, DC/DC Enclosed standard; modified sta
- 伊朗
- 2012-01-21

- 医药保健品及医疗器械 医药中间体/药用辅料等医疗器械保健品 保健器械中药材/中成药/中药酒西药/医药原料 生殖保健用品及器具/性保健用品及器具美容美体用品农兽药 其他药品 电子及信息产品 音像视听产品通讯产品电子安全设备 电子电工产品计算机及配件计算机外围设
- South African, group of companies, trading in high voltage switchgear, transformers, generators, electrical cabling, medical instruments, medical products and medicines.We are invovled in infrastructure development, power plant development and supplies fo
- 南非
- 2012-01-03

- 开关设备, 配电盘仪器, 变压器, 电气设备
- 开关设备, 配电盘仪器, 变压器, 电气设备
- 澳大利亚
- 2012-01-01

- 小型金属器具,五金器具,金刚石手工工具,硬金属手工工具,锤子,木锤,工具,钳子,夹子,工具,夹子类似工具,凿子,螺丝模,冲模,螺纹铣床,刨子,手工铰刀,手工铰刀类似工具
- 小型金属器具,五金器具,金刚石手工工具,硬金属手工工具,锤子,木锤,工具,钳子,夹子,工具,夹子类似工具,凿子,螺丝模,冲模,螺纹铣床,刨子,手工铰刀,手工铰刀类似工具
- 英国
- 2011-12-09

- Parts for electrical apparatus for electrical circuits; for electrical control nesoi, Printed circuits
- Parts for electrical apparatus for electrical circuits; for electrical control nesoi, Printed circuits
- USA
- 2012-02-06

- Miscellaneous cargo, Parts, except antenna, for transmission, radar, radio, TV, etc., nesoi, Static converters
- Miscellaneous cargo, Parts, except antenna, for transmission, radar, radio, TV, etc., nesoi, Static converters
- USA
- 2012-02-09

- Power Supplies->Power Supplies: DC
- Power Supplies->Power Supplies: DC
- UNITED STATES->California
- 2012-02-06

- Welding Accessories & Supplies->Rectifiers: Welding
- Welding Accessories & Supplies->Rectifiers: Welding
- INDIA->
- 2011-12-04

- Office Supplies->
- Office Supplies->
- HONG KONG->
- 2012-01-14

- Description of imported goods
- Quantity
- Weight
- Prices of imported goods
- Country/Region
- Arrival Date
- SWITCHING POWER SUPPLIES (FOR COMPUTER INTERNAL USE) INV#9282998850 INV#9282704179 INV#9282704175 INV#9282703323 EN NO 2002000655 7 PLTS ( 215 CTNS) HTS CODE# 8504.40.6012
- 7/PCS
- 2373/KG
- Online customer service
- HONG KONG
- 2010-7-19

- POWER SUPPLIES FOR TELECOMMNUNICATIONS PS# 5355 (44) 5356 (26) THIS SHIPMENT DOES NOT CONTAIN ANY WOOD PACKAGING MATERIALS
- 70/PCS
- 930/KG
- Online customer service
- HONG KONG
- 2010-7-19

- POWER SUPPLY OR BALLAST USED FOR LUMINARIES AND DO NOT REQUIRE FCC REQUIREMENTS PS# 5353(24) 5354(8) (400 PCS / 32 BOXES) THIS SHIPMENT DOES NOT CONTAIN ANY WOOD PACKAGING MATERIALS REMARK ONE(1) CARTON TORN AND RETAPED C/N. #2
- 32/PCS
- 396/KG
- Online customer service
- HONG KONG
- 2010-7-19

- POWER SUPPLIES,POWER OUT,<=50W TOY PARTS AND/OR COMPONENTS ETC 12V CHARGER SW.1.0A LEI PO NO,FHX4 P/NO. 00801-1778 6V CHARGER SW.0.35A LEI PO NO,FHX9 P/NO. 00801-1781 H.S. CODE8504409990 6V CHARGER SW.900MA LEI PO NO,FLR8 P/NO. 00801-1779 H.S. CODE8504409990 THIS SHIPMNET CONTAINS NO SOLID WOOD PACKING MATERIAL COMMODITY CODE SWITCHING WALL M
- 1041/CTNS
- 13995/KG
- Online customer service
- CHINA
- 2010-7-19

- POWER SUPPLIES
- 20/CTN
- 398/KG
- Online customer service
- HONG KONG
- 2010-7-19

- (2PLTS=84CTNS) SWITCHING POWER SUPPLIES (FOR COMPUTER INTERNAL USE) INVOICE NO. 9214107993 EN 2002061356 SHIPMENT CONTAI NS REGULATED WOOD PACKAGING MATERIALS WI TH IPPC LOGO
- 84/CTN
- 491/KG
- Online customer service
- HONG KONG
- 2010-7-19

- POWER SUPPLIES,POWER OUT,<=50W REF. YOUR P.O.#FIO1 ---------------------------------- - 16 PLTS 400 CTNS 20000 PCS 6V 400MA CHARGER PROBE P/N 00801-1483 PS-970-01(6V) REF. YOUR P.O.#FJL2 ---------------------------------- - 16 PLTS 400 CTNS 20000 PCS 6V 400MA CHARGER PROBE P/N 00801-1483 PS-970-01(6V) REF. YOUR P.O.#FNS6 ---------------------------------- - 11 PLTS 167 CTNS 10000 PCS 12V 1200MA CH
- 967/CTNS
- 9989/KG
- Online customer service
- CHINA
- 2010-7-19

- SWITCHING POWER SUPPLIES (FOR COMPUTER INTERNAL USE) EN NO 2002061314 INV# 9282704287 DC CODE CEVA_SPH HTS CODE 8504 4099 (1 PLT/9 CTNS/70 PCS)
- 9/PCS
- 126/KG
- Online customer service
- HONG KONG
- 2010-7-19

- POWER SUPPLIES,POWER OUT,<=50W ELECTRRONICS GOODS NON-SOLID WOOD PALLET PACKING WE USE WOODCHIP PALLET
- 18/PKGS
- 5053/KG
- Online customer service
- HONG KONG
- 2010-7-19

- SWITCHING POWER SUPPLIES (FOR COMPUTER INTERNAL USE) INV# 9214107852 EN# 2002061304 (61 CTNS/2 PALLETS) SHIPMENT CONTAIN WOOD PACKAGING MATERIAL THAT IS IN COMPLIANCE WITH THE IPPC STANDARD ISPM# 15
- 61/PCS
- 720/KG
- Online customer service
- HONG KONG
- 2010-7-19

- SWITCHING POWER SUPPLIES (FOR COMPUTER INTERNAL USE) EN NO 2002061313 INV# 9282704816 330 PCS DC CODE CEVA_AUSTIN_PN3 HTS CODE 8504 4099 (11 PLTS/330 CTNS)
- 330/PCS
- 4637/KG
- Online customer service
- HONG KONG
- 2010-7-19

- PCBA POWER SUPPLIES FOR AUTOMATIC DATA PROCESSING MACHINE(PCBA FOR AUTOMATIC DATA MACHINE IC 40)
- 31/CTN
- 501/KG
- Online customer service
- HONG KONG
- 2010-7-19

- POWER SUPPLIES,POWER OUT,<=50W HTS # 8504.40 POWER SUPPLY 7001484-J003 , D/N# 954421, 7 PLTS SHIP TO ASTEC AMERICA , INC. SPAN DE MEXICO S.A. DE C.V. (HUB-119) CAMINO EL CASTILLO 2100 M INTERIOR 1 CAMPUS TECNOLOGICO GUADALAJARA EL SALTO JALISCO, JAL 45680, MEXICO HTS CODE 8504.40. 7 PLTS 27 CTNS 7001484-J003 , D/N# 954423, 10 PLTS SHIP TO ASTEC AMERICA , INC. SPAN DE MEXICO S.A. DE C.V. (HUB-124)
- 67/CTNS
- 7226/KG
- Online customer service
- CHINA
- 2010-7-19

- SWITCHING POWER SUPPLIES (FOR COMPUTER INTERNAL USE)
- 180/CTN
- 2581/KG
- Online customer service
- HONG KONG
- 2010-7-19

- ELECTRICAL SUPPLIES VIZ UNINTERRUPTIBLE POWER SUPPLIES POWER SUPPLIES TELECOMMUNICATION CABLES
- 2594/CTN
- 16156/KG
- Online customer service
- CHINA
- 2010-7-19

- SWITCHING POWER SUPPLIES (FOR COMPUTER INTERNAL US
- 199/CTN
- 1934/KG
- Online customer service
- HONG KONG
- 2010-7-19

- POWER SUPPLIES,POWER OUT,<=50W UNINTERRUPTABLE POWER SUPPLY DC SOURCE CONSOLPOWER SUPPLIES,POWER OUT,<=50W E THIS SHIPMENT CONTAINS NO SOLID WOOD PACKIPOWER SUPPLIES,POWER OUT,<=50W NG MATERIALS. FREIGHT COLLECT CY-CY SCT10-2 POWER SUPPLIES,POWER OUT,<=50W 50TPC
- 1167/CTN
- 15804/KG
- Online customer service
- CHINA
- 2010-7-19

- POWER SUPPLIES,POWER OUT,<=50W UNINTERRUPTABLE POWER SUPPLY NETWORK SURGE SUPOWER SUPPLIES,POWER OUT,<=50W PPRESSOR WALL MOUNT BRACKT AC ADAPTER THIS SHPOWER SUPPLIES,POWER OUT,<=50W IPMENT CONTAINS NO SOLID WOOD PACKING MATERIA POWER SUPPLIES,POWER OUT,<=50W LS. FREIGHT COLLECT CY-CY SCT10-250TPC
- 944/CTN
- 15923/KG
- Online customer service
- CHINA
- 2010-7-19

- LADIES SHOES WIRE WITH CONNECTOR 100% COTTON WOVEN CAP REFRIGERATION PARTS MENS 100% WOOL WOVEN JACKET LADIES 100% COTTON KNITTED BLOUSE LADIES 84% COTTON 16% SILK WOVEN BLOUSE 100% COTTON WOVEN CAPS PCBA POWER SUPPLIES NYLON TOOL BAG POLYESTER ARTIFICIAL PLANTS 100PCT SYNTHETIC HAIR GOODS
- 780/CT
- 7764/KG
- Online customer service
- HONG KONG
- 2010-7-19

- Product Inquiry
- Inquiry Content
- Country Inquiry
- Updated
- Pelton Turbine
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2012-02-04

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2012-01-17

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-11

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-11

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-29

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2011-12-29

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2011-11-25

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2011-11-28

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-02-04

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-17

- For Your Attention:
- For Your Attention: The Managing Director/Owner REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES. Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-02-01

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2011-11-19

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-03

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-14

- Mobile Digitro
- Request for Quotation Subject: Request for Quotation CATGST 1368 Attn:. Hi, Please get us your very best offer for the following:- Si No. Quantity Unit Description 1 1 Nos Mobile Digitro Mobile Digitro is advanced digital door lock system. It can open/close the door using cellular phone or any phone outside. 14 modern digital features. Securer protection for you with a mobile system and wireless remote controller in the future. Digital Door Lock Note: Please mention our reference number in your quotations. Please mention origin of the product. All items shall be fully in accordance with the technical details of the requested. Awaiting Your Earliest Reply, Best Regards, Abilash M A +971 50 2268910 Catalyst Trading LLC P.O.Box 80801 Dubai, UAE. T +971 4 25 80 776 F +971 4 25 81 776 abilash.ma@thecatalystworld.com www.thecatalystworld.com Industrial Supplies Company in Middle East & Africa Catalyst Trading llc is specialized in industrial supplies such as Cutting Tools, Abrasives and Power Tools, Precision & Laboratory Equipment, Workshop Equipment, Hand Tools, Fasteners, Lubricants & Chemical Products, Office supplies & Stationery, Welding, Maintenance & Personal Protection
- United Arab Emirates
- 2012-01-11

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2†dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2†dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table†General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List†shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier†complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG†type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8†Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-11-24

- Pelton Turbine
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-12-27

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-12-11

- Pelton Turbine
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-11-17

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-14

- Name of trade enterprises
- Industry trade enterprises
- Contact
- Updated
- 深圳市健三实业有限公司
- 陶瓷滤波器;陶瓷谐振器;陶瓷鉴频器;声表面器件;石英晶体元件;微波介质产品;高频贴片电感;功率电感;变容二极体;变压二极体;无线网卡;inverter;Motor; driver; IC;EL; driver; IC;Power; supplies; IC;CCD; driver; IC;DC-DC; converter; IC;Temperature; sensor; I
- 2011-12-03

- 皇源电子(深圳)有限公司
- Power Supplies; Computer Power; Open Frame; Battery Charger; Auto Adapter; 开关电源; 电源适配器; 充电器; LCD TV; LCD电视; 液晶电视; 代工; 加工;
- 2012-01-21

- Shenzhen wellsun Technology Co.,Ltd
- 通讯产品配件
- 2012-01-06

- Shenzhen Flourishing Co.,Ltd
- 电动工具 UPS电源 电子电工
- 2012-01-29

- Shenzhen wellsun Technology Co.,Ltd
- 通讯产品配件
- 2011-11-13

- Shenzhen Flourishing Co.,Ltd
- 电动工具 UPS电源 电子电工
- 2011-11-18





