- Purchase products
- Buyers of operation
- Buyer country
- Updated
- 电子及信息产品 电子及信息产品 机械及设备 机械及设备
- I am from Saudi Arabia, and I am looking for electrical timer.
- 沙特阿拉伯
- 2012-01-08

- 家用电器 家用电器 电子及信息产品 电子及信息产品 灯具灯饰 灯具灯饰 小型车辆及配件 小型车辆及配件
- Smithfield Enterprises Limited is a stationary, office equipment and general supplies business based in Nairobi, Kenya. Our services include:- Supply of electrical appliances; electronics and IT Products; lamps and lightings fixtures as well as vehicle sp
- 肯尼亚
- 2012-01-25

- Linear adapters switching adapters smart chargers
- Electrical Equipment & Supplies->Battery Chargers
- CHINA->SHENZHEN
- 2012-01-02

- induction motor water pumps
- Electrical Equipment & Supplies->Generator Parts & Accessories
- CHINA->FUZHOU
- 2011-12-28

- insulation piercing connector IPC piercing connector
- Electrical Equipment & Supplies->Power Accessories
- CHINA->WENZHOU
- 2011-12-31

- cable and wire cable accessories conductor generator
- Electrical Equipment & Supplies->Electrical Product Agents
- CHINA->DALIAN
- 2011-11-20

- alternator generator diesel generator generator set
- Electrical Equipment & Supplies->Generators
- CHINA->NINGDE
- 2012-01-05

- steam turbine biogas generator wind turbine diesel generator
- Electrical Equipment & Supplies->Generators
- China->Shanghai pu dong
- 2012-01-05

- Description of imported goods
- Quantity
- Weight
- Prices of imported goods
- Country/Region
- Arrival Date
- MILITARY SHIPMENT - ISU90 CONTAIN EQUIPMENT, OFFICE SUPPLY, CONSTRUCTION MATERIAL DIMENSION 108 X 88 X 92 (EACH) TOOL KIT ELECTRICIAN KIT CARPENTER KIT MAINTAINANCE TOOL BOX WOODEN CRATE TENT PLUMBER COTS MEDICAL SUPPLIES LAPTOP CONVERTER, ELECTRICAL
- 16/PKGS
- 30480/KG
- Online customer service
- PAPUA NEW GUINEA
- 2010-3-22

- SHIPPERS LOAD, COUNT & WEIGHT 1 CONTAINER CONTAIN 1171 PKS OF BRASS FITTINGS,PLUMBING ACCESSORIES, TUBE AND VALVE FOR PLUMBING SUPPLIES, PLUMBING SUPPLIES,MOTT SHWR RISER CHR CURVED,CE125 5/16 RIVET, NICKEL PLATED, CE125 5/16 RIVET, BRASS PLATED,ELECTRICAL CONNECTOR SOCKET,REFLECTOR, BAYONET SHELL BASE,PC BOARD ASSY,BRACKET,BRASS PLUMBING PARTS,TORQUE WRENCH,PLASTIC BAGS ++ EQUIPMENT SUBSTITUTION
- 1171/PK
- 20423/KG
- Online customer service
- CHINA TAIWAN
- 2010-4-11

- OIL WELL EQUIPMENT AND SUPPLIES, NOS 5 PKGS- 1. TUBING HANGER UPPER PLUG 2. KIT, ISOLATION SLEEVE UPPER 3. ASSEMBLY 3/4 CI MOUNTING BLOCK 4. ASSEMBLY TREE DEBRIS CAP 5. ASSEMBLY ELECTRICAL PENETRATOR 6. SHIPPING SUB ASSEMBLY, G2 DEEPWATER STOCK TREE FREIGHT PREPAID SHIPPED ON BOARD 04/02/2010
- 5/SKD
- 27728/KG
- Online customer service
- FINLAND
- 2010-4-14

- 2483 CARTON GDSM, INCLUDING TEXTILES (NON-HAZ), NOS LEATHER BELTS GENUINE LEATHER BELTS BONDED LEATHER BELTS INV 100670/100632 ELECTRICAL EQUIPMENT, NOS CONTACTORS PO 4352-206110 PLUMBING SUPPLIES AND ACCESSORIES, NOS PLUMBING SUPPLIES 111CTNS IN 8PLTS THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS. PROMOTIONAL ITEMS, NOS SIDELINE GRILL SET PICNIC BAG SUNGLASSES, PARTS AND ACCESSORIES, NOS SUNGL
- 2483/PCS
- 11757/KG
- Online customer service
- CHINA
- 2010-4-14

- 2483 CARTON GDSM, INCLUDING TEXTILES (NON-HAZ), NOS LEATHER BELTS GENUINE LEATHER BELTS BONDED LEATHER BELTS INV 100670/100632 ELECTRICAL EQUIPMENT, NOS CONTACTORS PO 4352-206110 PLUMBING SUPPLIES AND ACCESSORIES, NOS PLUMBING SUPPLIES 111CTNS IN 8PLTS THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS. PROMOTIONAL ITEMS, NOS SIDELINE GRILL SET PICNIC BAG SUNGLASSES, PARTS AND ACCESSORIES, NOS SUNGL
- 2483/PCS
- 11757/KG
- Online customer service
- CHINA
- 2010-4-14

- 2483 CARTON GDSM, INCLUDING TEXTILES (NON-HAZ), NOS LEATHER BELTS GENUINE LEATHER BELTS BONDED LEATHER BELTS INV 100670/100632 ELECTRICAL EQUIPMENT, NOS CONTACTORS PO 4352-206110 PLUMBING SUPPLIES AND ACCESSORIES, NOS PLUMBING SUPPLIES 111CTNS IN 8PLTS THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS. PROMOTIONAL ITEMS, NOS SIDELINE GRILL SET PICNIC BAG SUNGLASSES, PARTS AND ACCESSORIES, NOS SUNGL
- 2484/PCS
- 11757/KG
- Online customer service
- CHINA
- 2010-4-14

- 2484 CARTON GDSM, INCLUDING TEXTILES (NON-HAZ), NOS LEATHER BELTS GENUINE LEATHER BELTS BONDED LEATHER BELTS INV 100670/100632 ELECTRICAL EQUIPMENT, NOS CONTACTORS PO 4352-206110 PLUMBING SUPPLIES AND ACCESSORIES, NOS PLUMBING SUPPLIES 111CTNS IN 8PLTS THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS. PROMOTIONAL ITEMS, NOS SIDELINE GRILL SET PICNIC BAG SUNGLASSES, PARTS AND ACCESSORIES, NOS SUNGL
- 2484/PCS
- 11757/KG
- Online customer service
- CHINA
- 2010-4-14

- 2483 CARTON GDSM, INCLUDING TEXTILES (NON-HAZ), NOS LEATHER BELTS GENUINE LEATHER BELTS BONDED LEATHER BELTS INV 100670/100632 ELECTRICAL EQUIPMENT, NOS CONTACTORS PO 4352-206110 PLUMBING SUPPLIES AND ACCESSORIES, NOS PLUMBING SUPPLIES 111CTNS IN 8PLTS THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS. PROMOTIONAL ITEMS, NOS SIDELINE GRILL SET PICNIC BAG SUNGLASSES, PARTS AND ACCESSORIES, NOS SUNGL
- 2484/PCS
- 11757/KG
- Online customer service
- CHINA
- 2010-4-14

- ELECTRIC GOODS
- 298/CTN
- 1904/KG
- Online customer service
- CHINA
- 2010-4-10

- APPLIANCE PARTS, NOS AS PER INVOICE 515/10 8 CARTONS ON 1 PLT APPLIANCE PARTS, NOS SPARE PARTS AS PER INVOI 1510004811 APPLIANCE PARTS, NOS APPLIANCE PARTS FAK EXCLUDING APPARELS AND TEXTILES, NOS SPARE PARTS FOR COOKER HOODS AS PER INVOICE 302073084 1 PLASTIC PALLET WITH 4 CARTONS PLACED ON IT ELECTRICAL EQUIPMENT, NOS HS CODE 84829190 PLUMBING SUPPLIES AND ACCESSORIES, NOS CERAMIC DISK CARTRIDGE
- 489/PCS
- 16643/KG
- Online customer service
- ITALY
- 2010-5-2

- AS FOLLOWS 4 CRATES & 51 CARTONSINDUST RIAL EQUIPMENT AIR TOOLS ELECTRICAL EQUI PMENT NET WEIGHT5.000 KGS HC?????? PART LOAD CONTAINER
- 55/PCK
- 12125/LB
- Online customer service
- GREECE
- 2010-5-12

- AS FOLLOWS 4 CRATES & 51 CARTONSINDUST RIAL EQUIPMENT AIR TOOLS ELECTRICAL EQUI PMENT NET WEIGHT5.000 KGS HC?????? PART LOAD CONTAINER
- 55/PCK
- 12125/LB
- Online customer service
- GREECE
- 2010-5-12

- SHIPPERS LOAD, COUNT & WEIGHT 1 CONTAINER CONTAIN 808 PKS OF T.I.O.,STEEL TANK PARTS,PLUMBING ACCESSORIES,AUTO SPARE PARTS,BELTING (RUBBER V-BELT),PLUMBING SUPPLIES, ALUMINUM FAN,ELECTRICAL CONNECTOR SOCKET, BRACKET, REFLECTOR, FILM,RIVET NUTS,FABRIC,PARTS OF PRINTING MACHINE,PARTS OF BRAIDING MACHINE EQUIPMENT SUBSTITUTION PER RULE 2.30 FREIGHT PREPAIDFM TXG TO KAO TOPPING
- 808/PK
- 22247/KG
- Online customer service
- CHINA TAIWAN
- 2010-5-21

- SODIUM SULFIDES SHIPPERS LOAD AND COUNT 22 BOXES WITH 506 PIECES WITH ILLUMINATION EQUIPMENT F.A. 6204.43.99 P.B. 282.94 KGS 5 PALLETS WITH 27 SACKS,111 BUCKET, 48 BOXES WITH VETERINARY SUPPLIES F.A. 84223099 P.B. 2,088.00 KGS 2 CRATES CONTAINING CONDUIT BOXES FOR ELECTRICAL INSTALLATIONS F.A. 7609.00.99 P.B. 482.00 KGS 2 PALLETS WITH 1200 KGS FERROSILICIO MAGNESIUM F.A.72.02.29.99 P.B. 1,202.00 K
- 78/PCS
- 21247/KG
- Online customer service
- MEXICO
- 2010-5-24

- COLORED LIGHTS
- 627/CTN
- 9220/KG
- Online customer service
- CHINA
- 2010-6-24

- 1343 PACKAGE MEDICAL SUPPLIES, NOS RESUSCITATORS P/O6500108355/6500104075 255CTNS=8PLTS GDSM EXCLUDING TEXTILE AND FOOTWEAR, NOS 7 ITEM HAIR CLIPS FOOTWEAR, VIZ SHOES, NOS DESCRIPTION80 COWHIDE LEATHER + 20 MAN MADE LEATHER PO NO.4500143885,4500145669 ELECTRICAL EQUIPMENT, NOS CONTACTORS 120CTNS=4PLTS PO 4352-216975/4352-216687/4352-216843/ 4352-217099 GDSM, INCLUDING TEXTILES (NON-HAZ), NOS BONDE
- 1343/PCS
- 12669/KG
- Online customer service
- CHINA
- 2010-6-29

- COLORED LIGHTS
- 627/CTN
- 9220/KG
- Online customer service
- CHINA
- 2010-6-24

- 1343 PACKAGE MEDICAL SUPPLIES, NOS RESUSCITATORS P/O6500108355/6500104075 255CTNS=8PLTS GDSM EXCLUDING TEXTILE AND FOOTWEAR, NOS 7 ITEM HAIR CLIPS FOOTWEAR, VIZ SHOES, NOS DESCRIPTION80 COWHIDE LEATHER + 20 MAN MADE LEATHER PO NO.4500143885,4500145669 ELECTRICAL EQUIPMENT, NOS CONTACTORS 120CTNS=4PLTS PO 4352-216975/4352-216687/4352-216843/ 4352-217099 GDSM, INCLUDING TEXTILES (NON-HAZ), NOS BONDE
- 1343/PCS
- 12669/KG
- Online customer service
- CHINA
- 2010-6-29

- POWER SUPPLIES,POWER OUT,<=50W ELECTRICAL EQUIPMENT(DRIVES) 1 40HIGH CUBE CONTAINER SLAC 2 CRATES SLAC ELECTRICAL EQUIPMENT(DRIVES) PO.# 7010287 B13 # 02D917 BC 6884 20100600277 HS CODE 8504.40
- 2/CRT
- 16330/KG
- Online customer service
- CANADA
- 2010-7-12

- 132 CARTONS-LADIES TOPS- TH611020 1223.62 KGS 7.960 CBM 8 PIECES-ELECTRICAL EQUIPMENT-TH850720 1648 KGS 2.472 CBM 5 PIECES-ELECTRICAL EQUIPMENT-TH850490 1398 KGS 8.662 CBM 1275 CARTONS-COSMETICS CREAM AND LOTIONS-TH 330499 2204 KGS 6.552 CBM 25 BOXES-60 ML PLASTIC B OTTLES-TH392390 386 KGS 5.852 CBM 87 BOXES-AUTOMOTIVE ALARM SYSTEMS-TH853690 2000 KGS 10.920 CBM 67 CARTONS-MEDICAL SUPPLIES-TH30059
- 1743/LSE
- 11289/KG
- Online customer service
- SOUTH AFRICA
- 2010-7-14

- Product Inquiry
- Inquiry Content
- Country Inquiry
- Updated
- Pelton Turbine
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-12-15

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-11-19

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2012-01-08

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2†dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2†dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table†General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List†shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier†complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG†type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8†Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2011-12-17

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2012-01-18

- Double-Stage Vacuum Transfomer Oil Regeneration Purifier
- Dear Sir: We are Zhengzhou Jimao Barter Co., Ltd. She is a large company, there are more than 100 employees. Belonging to top 100 enterprises in Henan Province. The company\'s main business is the import and export. The company for many years is the contract and trustworthy enterprises with the title. We are interested in your Electrical Equipment & Supplies.Please send specification,type and more information to our e-mail : jm227@126.com or 86-0371-60959792 15093352271 in order for my requirements. smilly
- China
- 2011-12-03

- cross pendant with red cz stone Blue Zirconia Ring Blue Zirconia Ring Blue Zirconia Ring
- Dear One, Compliments of the day. My name is Mr. KOBINA MENSAH (My Passport identity is attached), a GHANIAN Citizen residing in London. I work with ETHOS FERANIUM Company here in the London, a leading oil company and producers of varieties of chemical & oil products. Frixion is a unique combination of high-quality, non-toxic, specially designed esters that uses only the elements of carbon, hydrogen and oxygen. This product is an ultramodern lubricant for machines and ultramodern hard wares. I came across your contact on the internet after going through your profile and decided to contact you.After the death of my Uncle, who was a former supplier to the ETHOS FERANIUM Company in London, I applied for a job and eventually I was offered a job in the company, although my salary is not fat enough but i enjoy the kind caring of the company. Since after the death of my Uncle, his manager mishandled the Management of his company which led me to apply for a job in ETHOS FERANIUM Company, because of his mishandling of my Uncle\'s company, I decided to contact a reliable and trustworthy person who can assist tremendously in this transaction. My Uncle normally buys this items (Frixion) from agents based in Ghana , at the rate of Dhs 6,000,00 equivalent of ($1,700,00 USD) and supplies to ETHOS FERANIUM Company at the rate of $4,800,00 USD. With a profit margin of $3,100, 00 per tin. My Uncle\'s capacity of supply to the company is a minimum of 100 tins per month. On your acceptance to this supply, although you\'re not an oil dealer the opportunity of this lucrative business should not slip away and i do rely on your good personality before contacting you. You and I will reach an agreement, based on the profit yield in this transaction on % ratio, before releasing the direct contact of ETHOS FERANIUM Company London, with the Sales agents based in Gold Coast . ETHOS FERANIUM Company will send there purchasing manager to Gold Coast for confirmation the items, before procurement and shipment. Looking forward for your favorable reply me through email kobinamensah@rocketmail.com or call on +447818605803. Best regards. Mr. KOBINA MENSAH
- Ghana
- 2011-12-14

- Pizza Pan
- Need for opening of a pizzeria in pakistan a gas burning pizza oven with min capacity of 6 pizzas 30cm at the time and all hot plates and side pizza equipment. Jean luc Hue DIPFS (Diplomatic Food and Beverage Supplies PTY Ltd)
- Switzerland
- 2012-01-08

- Led Flashing Life Buoy
- We are leading importer and trader in marine safety equipment and other marien supplies. Please forward your product information and prices. We require materials in bulk quantity.
- India
- 2011-11-18

- For Your Attention:
- For Your Attention: The Managing Director/Owner REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES. Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-02

- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES
- REF: IRAQI RECONSTRUCTION EFFORTS - VARIOUS SUPPLIES For Your Attention: The Managing Director/Owner Hello, My name is Alikali Yusuff; this is an urgent Contract Invitation from Iraq. My benefactor in the new regime is the Director General of the Budget Department/Debt Management Office (DMO) of the Ministry of Finance. He has mandated me to seek for your co-operation in a multi million Dollars worth of contract supplies on various goods and equipments: Armored Vehicles Supplies. Civilian Aircraft. Hospital Equipment. Water Treatment Plants. Water Recycling. Hydro Electric Power Plant (on the River Euphrates). Agricultural and Irrigation equipment. Crude Oil Mining and Shipment overseas. High Tech and Telecommunications equipment. General Air Purification and Filtration. Financial Services; POS, ATM. Heavy duty construction and Earth moving Equipment. Machinery and Metal Tooling. Medical equipment & Health Products Computer Products, Hardware & Electronic Equipment. Waste Disposal Equipment. Air Pollution Control. Building and Estate Management. Buses and Cars for ultra modern urban transportation network. Miscellaneous. If your company is capable of supplying any of the above-mentioned items, then kindly respond immediately DETAILING YOUR DIRECT TELEPHONE NUMBERS AND EXCLUSIVE E-MAIL and a scanned attachment of your well articulated TENDER. As soon as we receive these, I shall get back to you with all details exclusively. NB: KINDLY REPLY TO MY PRIVATE EMAIL HERE( alikaliyusuff0111@live.com ) Regards, Alikali Yusuff Program Management Office. NB: 60% upfront is paid for all supplies
- Iraq
- 2012-01-09

- Cutting Type Sewage Electrical Submersible Pump
- I want to know: Price,Specification,Payment,Freight,Sample Terms,Verified Suppliers. Dear sir, We are one of Indonesian Company which have business in Industrial Supplies. We have core business in Cables supplies, Power Generation, Material Handling Equipment System and Electromotor supplies. At this time we need ESP(Electric Submersible Pump) Cables for Gas and Oil Industry. We ask your favour to quote us for AWG 4 ESP cable ( round ) with Galvanize Armour. We need that cable with quantity around 6500 feet length. Please send your quotation complete with delivery time ( Shipping to Medan, INDONESIA ), special discount and terms of payment. If it's possible please send us your quotation within 2 days after received this inquiry. We will wait for your kindly reply as soon as possible. Thank you for all of your kindly support. Best regards, John Henry CV.Manser Pandawalima Engineering Jl. Medan Tenggara VII, No.47B Medan 20228 North Sumatera INDONESIA Phone : +6261-7869883 Fax : +6261-7864179 Email : sinindo_mdn@hotmail.com / manser@mail2john.com Website : www.manser.indonetwork.co.id
- Indonesia
- 2012-01-02

- buying lead
- Dear Sir or Madam: This buyer needs sourcing these following products on tootoo.com and please contact this buyer directly ASAP, if your products can be perfectly matched: please do not reply vip1@tootoo.com. please contact with suppiler\\\'s email address directly. Buying Electrical Components And Equipment: We are a large importer of bulk electrical components and equipment. We are interested in regular purchase of Batteries, Chargers, Circuit Breakers, Contactors, Electric Power Tools, Electrical Ceramics, Electrical Plugs, Electrical Sockets, Electronic Instrument Enclosures, Fuse Components, Fuses, Generators, Insulation Materials, Insulation Elements, Motor Parts, Motors, Power Accessories, Power Distribution Equipment, Power Supplies, Audio, Video, Lighting, Radio, TV Equipment, Relays, Switches, Transformers, Wires, Cables, Cable Assemblies etc. Please contact us at our email if you are able to work with us. CompanyName:Vigortronix LtdCountry/Territory:United KingdomTelephone: 44-01993 777570 Fax: 44-01993 777580 Email: sales@vigortronix.com
- China
- 2012-01-21

- buying lead
- Dear Sir or Madam: This buyer needs sourcing these following products on tootoo.com and please contact this buyer directly ASAP, if your products can be perfectly matched: please do not reply vip1@tootoo.com. please contact with suppiler\\\'s email address directly. Buying Electrical Components And Equipment: We are a large importer of bulk electrical components and equipment. We are interested in regular purchase of Batteries, Chargers, Circuit Breakers, Contactors, Electric Power Tools, Electrical Ceramics, Electrical Plugs, Electrical Sockets, Electronic Instrument Enclosures, Fuse Components, Fuses, Generators, Insulation Materials, Insulation Elements, Motor Parts, Motors, Power Accessories, Power Distribution Equipment, Power Supplies, Audio, Video, Lighting, Radio, TV Equipment, Relays, Switches, Transformers, Wires, Cables, Cable Assemblies etc. Please contact us at our email if you are able to work with us. CompanyName:Vigortronix LtdCountry/Territory:United KingdomTelephone: 44-01993 777570 Fax: 44-01993 777580 Email: sales@vigortronix.com
- China
- 2011-12-04

- buying lead
- Dear Sir or Madam: This buyer needs sourcing these following products on tootoo.com and please contact this buyer directly ASAP, if your products can be perfectly matched: please do not reply vip1@tootoo.com. please contact with suppiler\\\'s email address directly. Buying Electrical Components And Equipment: We are a large importer of bulk electrical components and equipment. We are interested in regular purchase of Batteries, Chargers, Circuit Breakers, Contactors, Electric Power Tools, Electrical Ceramics, Electrical Plugs, Electrical Sockets, Electronic Instrument Enclosures, Fuse Components, Fuses, Generators, Insulation Materials, Insulation Elements, Motor Parts, Motors, Power Accessories, Power Distribution Equipment, Power Supplies, Audio, Video, Lighting, Radio, TV Equipment, Relays, Switches, Transformers, Wires, Cables, Cable Assemblies etc. Please contact us at our email if you are able to work with us. CompanyName:Vigortronix LtdCountry/Territory:United KingdomTelephone: 44-01993 777570 Fax: 44-01993 777580 Email: sales@vigortronix.com
- China
- 2011-12-17

- NINGBO SYSTEM ELECTRONICS CO.,LTD
- Dear Sir or Madam: This buyer needs sourcing these following products on tootoo.com and please contact this buyer directly ASAP, if your products can be perfectly matched: please do not reply vip1@tootoo.com. please contact with suppiler\'s email address directly.Buying Electrical Components And Equipment: We are a large importer of bulk electrical components and equipment. We are interested in regular purchase of Batteries, Chargers, Circuit Breakers, Contactors, Electric Power Tools, Electrical Ceramics, Electrical Plugs, Electrical Sockets, Electronic Instrument Enclosures, Fuse Components, Fuses, Generators, Insulation Materials, Insulation Elements, Motor Parts, Motors, Power Accessories, Power Distribution Equipment, Power Supplies, Audio, Video, Lighting, Radio, TV Equipment, Relays, Switches, Transformers, Wires, Cables, Cable Assemblies etc. Please contact us at our yahoo email if you are able to work with us. CompanyName:Vigortronix LtdCountry/Territory:United KingdomTelephone: 44-01993 777570 Fax: 44-01993 777580 Email: sales@vigortronix.com
- China
- 2012-01-26

- Small Hydro Turbine Unit(power plant )
- Penton2 CONTENT SEC1 - EQUIPMENT / MATERIAL DESCRIPTION SEC2 - STANDARDS SEC3 - REQUIRED DOCUMENTS SEC4 – PROPOSAL CONDITION SEC 1 EQUIPMENT / MATERIAL DESCRIPTION 1 GENERAL This Material Requisition covers the technical requirements for the design, engineering, manufacturing, supply, delivery FOB, testing, supervision to erection, start up, commissioning, contractual spare parts and training of: N° 2 Pelton turbines complete with auxiliaries N° 2 Turbine inlet vales of spherical type complete with auxiliaries N° 2 Turbine speed governors complete with auxiliaries N° 2 Generators horizontal or vertical shaft according the The equipment will be installed in the Monga Power Station located in Panama Seller supply shall include all the items required in this specification as well as all the other accessory and additional equipment that the Seller deems to be necessary for a good performance and safe operation of the supplied package. Each Pelton turbine will be directly coupled with an electric generator supplied as package with the turbine Seller shall design the Pelton Turbines and their auxiliaries and shall be responsible for the design of the whole turbine /generator lineshaft The Pelton Turbines will discharge in a non-pressurized channel. 2.REQUIREMENTS 2.1 GENERAL NOTES The design, manufacturing, testing, inspection, painting, packing, supply and workshop testing of all equipment / materials included in the scope of work shall be in accordance with this Material Requisition, attached contractual specifications and applicable codes and standards. Eventual deviations or modification are acceptable provided sufficient explanation to justify them Under no circumstances, any of the statements of this specification or of the purchase order waive the supplier to provide all services and supplies necessary to fulfill its contractual obligations. Anyhow the compliance with standards, Codes and Specifications does not relieve the Vendor for his responsibility to furnish equipment, materials and accessories of proper design and manufacturing as well as fully suitable for all specified duties, operating conditions and guaranteed performances. Purchaser approval of any Vendor or Vendor sub-supplier drawings / documents shall not relieve the vendor from any of his responsibility for errors or omissions which may exists, even though Work has been done in accordance with such approved drawings and documents. Where such errors or omissions are discovered even later, they shall be made good by the Vendor at his sole expense irrespective of any approval of the Purchaser. The approval or acceptance by the Purchaser of any inspection or test does not relieve the vendor from his responsibility regarding the guarantees and will not however prejudice the right of the Company to reject the supply if it does not comply with specifications or, once erected, it does not give complete satisfaction in service. 2.2 SPECIAL Equipment shall be designed for indoor installation inside to a power house with forced ventilation, installation elevation will be 800,00 masl approx. The operating temperate will range from 0° to 50°C and the maximum relative humidity will be of 90% Equipment shall be designed for continuous operation and parallel connected to a national network 3 CONTRACT LANGUAGE (1) All contractual documents related to supply must be written in the two languages here below indicated : - English X - Spanish contract technical dwg 4.CONFLICTING REQUIREMENTS, in case of contract Any deviations from the requirements of the documents applicable to the project, shall be clearly pointed-out and submitted to the Purchaser for Approval before starting the manufacturing of the related pieces. In case a deviation is not approved by the Purchaser, the Seller will have to follow the requirements of the documents applicable to the project. Any impact on cost / schedule relating to this will be Seller responsibility. 5.GARANTEES 5.1 GENERAL Approval of design, documents, inspections and tests does not affect the contractual rights of the Purchaser, and under no circumstances waives contractual obligations of the Seller especially with regard to design, performance, construction and materials. The Seller is fully responsible for: his entire scope of work providing correct interfacing data at the boundary limits of its supply conformity of his scope of delivery and services to this specification and to all codes and standards herein mentioned. 5.2 TECHNICAL GUARANTEES 5.2.1OVERALL The Seller guarantees: faultless construction and appropriate material perfectly satisfactory design and function correct choice of material and painting that precludes corrosion and erosion, attacks, which might affect function and efficiency The Seller shall bear full responsibility for the technical accuracy, constructability, and functionality under extreme operating conditions of the systems until expiration of the guarantee period of the plant, system compatibility with other interfacing equipment and compliance with all applicable codes, standards as well as for meeting the delivery deadlines. 5.2.2DESIGN PERFORMANCE The Seller guarantees the quoted performances and the pitting and erosion performances in accordance with IEC 60-609-2-97 5.3SITE GENERAL CONDITIONS The Supplier shall take special precautions in the selection and protection of materials and equipment against deterioration due to the effects of humidity, temperature and dust. Particular attention must be paid to selection and protection of electronic components, instrumentation and temperature/humidity sensitive equipment. 5.OVERALL REQUIREMENTS FOR THE COMPLETE TURBOGENERATOR UNIT 6.1 PELTON TURBINE The hydro turbines shall be Pelton type fed by river water at the conditions described in the attached documents. The turbines will be normally operated in parallel with the grid; the normal operating mode is at the maximum load consistent with the available flow, head and other operating control parameters as mentioned in the attached specification Each turbine is equipped with an inlet valve of the butterfly type, whose technical features and operating mode shall be described with the offer Each turbine will be directly coupled to a 4,16 KV electric generator (included from the supply)with brushless or selfexcited system and shall be fitted with all the necessary supervisory and control devices to enable remote start up, operation and shutdown from the control room. 6.2 SPEED GOVERNOR Each turbine is equipped with its own speed governor whose technical features and operating mode shall be described in the offer 7. SCOPE OF SUPPLY Scope of supply will consist of, but not limited to: Equipment and materials N° 2 Pelton Turbines as per attached characteristic, each one consisting of but not limited to: Pelton wheel Turbine box Turbine shaft complete with bearings Bearing housing cooling coils Cooling water instruments as required Turbine iinjectors and deflectors Servomotors Rigid coupling with generator and relevant coupling bolts Vibration monitoring system (Option) Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts Recommended spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Turbine auxiliary equipment and systems Steel base or inserts to be embedded if any Position control sensors for inyectors and deflectors Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for turbine control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Turbine local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Butterfly Valves each one consisting of, but not limited to: Valve body and ball Counterweight for valve closing purpose Valve foundation plates Automatic Valve by-pass to equilibrate the pressure up and down stream the max operation pressure Dismantling joint downstream of the valve Flanged interconnecting piece upstream of the valve for connection with penstock complete with of the necessary flanged taps Limit switches Oleodynamis type opening , servomotor and auxiliary equipment Anchor bolts for installation on foundation First filling of lubricants. Special tools, saddles and slings for transport, erection and maintenance, incl. hydraulic device for stretching bolts, if any Commissioning spare parts - 2 years recommended Spare parts Painting Internal/external piping (piping 2” dia. and above shall be supplied prefabricated with end preparation) All piping terminal connections shall be supplied complete of counter flange an bolting; if welded shall be prepared for butt welding Instruments, transmitters, on-off valves, control valves, metal temperature elements, etc. for control, monitoring and safety system Junction boxes and cabling up terminal junction boxes Valve local control panel with suitable interface Temporary instrumentation for tests and performance tests N° 2 Turbine Speed Governor each one consisting of, but not limited to: Control, monitoring and safety system of the turbine including any other necessary type of equipment/devices, even if not mentioned in this material requisition, in order to provide a complete black box in addition to: - Instruments, transmitters, on-off valves, control valves, metal temperature elements, impulse lines, instrument block valves, racks, JBs , Control Panels, interfacing system etc. on the Turbine / Spherical Valve including associated auxiliary circuits equipment and piping - Cables, conduits and accessories for the connections of above field instrumentation up to local junction boxes and junction boxes themselves. - Turbine Protection, Control and Supervisory system and instruments N° 2 Oleohydraulic control stations complete with motorized pumps, oil tanks, oil accumulators, oil cooler (water cooled) actuated and manual valves, filters, instruments, fittings, including - Flow reduction valve to control the actuator operation speed Conntrol panel with fitted a microprocessor OTC controller to control the turbine operation Commissioning spare parts Recommended spare parts Painting First filling of control oil.if any Special tools, saddles and slings for transport, erection and maintenance. Temporary instrumentation for tests and performance tests Services Process, mechanical, electrical and structural design for the equipment; Workshop and site inspections and tests; Training of Client personnel at site; Mechanical and electrical supervisors to the installation and test on commissioning Temporary instrumentation for turbine performance tests including installation before and removal after the test Conducting turbine performance test including preparation of procedures, test supervisory personnel, analysis of data and final report; Basic and detailed design for the equipment, systems and interfacing coordination for items not included in the scope of supply such as generators and DCS. Engineering documentation (1) Minimum required documentation shall be as per paragraph 3.4 “Required Document Table” General-Please provide with the offer a draft of: Quality plan and ITP (Inspection and Test Plan); List of tests included in the offer Packing suitable for transportation Battery limits - Penstock upstream side of the interconnecting piece (13 m from turbine axis approx) - Turbine shaft generator side: coupling flange to generator shaft flange, coupling bolts included - Civil Works: foundation plates and counterplates embedded in concrete first and second phases - Drain system: drain piping outlet into turbine discharge channel - Cooling water: in / out cooling water connections for control oil cooler and bearing housing cooling coils,if any - Electrical/Instrumentation: terminal boxes for electric motors Terminal strips of skid junction boxes Terminal strips of field instruments junction boxes Terminal strips of local control panels for connection with above junction boxes Terminal strips of local control panels for DCS interconnections Note 1) interconnection cabling between skid mounted junction boxes and local control panels are excluded from the supply interconnection cabling between field junction boxes and local control panels are excluded from the supply interconnection cabling between local control panels and DCS are excluded from the supply 8.PACKING All equipment/materials included in the scope of supply shall be packed for ocean transport. 9.NOISE LEVEL Sound pressure level equivalent 85 dBA @ 1 meter 10.DELIVERY Deliveries, FOB Italian Port, in months from purchase order date: Please fill, this schedule and return it with the offer - Unit n° 1 & 2, plates to be embedded if any months - Unit n° 1, Pelton box, feeding piping including fo bolts and plates, phase concrete embedded materials months - Unit n° 1, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ……… months - Unit n° 1 Butterfly valve complete with accessories and connecting Piece to penstock………… - Unit n° 1 Speed governor complete………months - Unit n° 2, Pelton box, feeding piping including bifurcation, foundation bolts and plates, 2nd phase concrete embedded materials months - Unit n° 2, Completion of Pelton turbine n° 1 (wheel, shaft, bearings, nozzles, etc) ………months - Unit n° 2 Butterfly valve complete with accessories and connecting Piece to penstock…………month - Unit n° 2 Speed governor complete…………months SECTION 2 APPLICABLE STANDARDS 1. GENERAL The Standards applicable to the supply are listed in the documents attached to the Material Requisition. Different Standards can be proposed but have to be proved equivalent or more stringent than the listed ones. Standards submitted for approval will be in Spanish and English language SECTION 3 VENDOR DOCUMENTATION In case of contract or subcontract 1. DOCUMENTS DUE DATES As minimum requirement, the documents to be issued by Seller are listed in the following Paragraph 3.4. The due dates will be mutually agreed during the final negotiation, before the issue of the Purchase Order (P.O.). The final “Document List” shall be issued by Vendor two (2) weeks after the issue of the P.O. With reference to above Paragraph 3.4, Seller is informed that in case the documents shall not be issued within the contractual due date, the penalties indicated in the purchase order will be applied. Seller is advised that, further to listed documents, supply shall include an “Equipment Dossier” complete of Material Certificates, Inspection Reports and other involved issues. 2. FORMATS OF DOCUMENTS All drawings shall be prepared using a CAD system; final electronic files shall be “DWG” type (i.e. AutoCAD® type). Other documents shall be prepared using Microsoft® Word®97 or Excel®97.The purchaser can use different system to be coordinated with us Preferred maximum size for drawing is A1. Copies of drawings in format A1, A2 or A3 shall be folded to A4 size. 3. IDENTIFICATION Any document shall have its own identification number, on its right - bottom side. The documents shall bear the Project Name, the identification of the involved equipment or item and the related contractual tag number. Each document page shall have a page number , to be referred also to the total number of pages of the document itself, as well as the number of its revision. SECTION 4 1)Turbine design data Turbines style Pelton Design Flow Qn 2.25 cmt/sec Gross head Hg 141 mt Net head Hn 140.14 m Penstock diam. 48 inch- Tick 3/8” Total length 823 Mt Project Flow curve as function of the time period See attached table Table 13: Time period in % Flow cm3/sec Time period % Flow cm3/sec No of nozzles : to be quoted Shaft Vertical or horizontal Rated speed >= 600 rpm Material : Runner Inox steel ASTM A 743 or similar Bifurcation Steel Nozzles Inox steel CrNi 17-4 or similar 2) Generator Type Syncronous, 3ph,TEFC t Rated voltage: 4.16 KV Rated frequency 60 Hz Power factor 0.8 Rated speed >= 600 rpm Overspeed <= Vn x 200 % time for 5 Min Excitation type Brushless Class of insulation F/F ( Stator/rotor wind.) Temperature rises to Class B of IEC standards/codes Construction to be quoted Protection degree IP 23 Service S1 Cooling type IC 01 Standards IEC Ambient conditions: Hasl < 1000 mt Max amb temp 45°C Hr from 70 to 90 % Ambient Tropical climate Fittings: No 1 Automatic voltage regulator No 3 C.ts on neutral point ratio …. / 1 – 30 VA burden No 3 PT100 type RTDs on stator windings No 1 Pt 100 type RTD on each bearing No 1 Anticondensation heater No 1 Speed measuring inductive type Lifting lugs No 1 set of special tools if necessary for assembly and disassembly purpose No 2 valves on admission Type Butterfly Nom diameter 700 mm Rated pressure 25 Bar Kind of closure by counterweight Kind of opening oleohydraulic or equivalent Accessoires as per art 2 above Aux voltage 220 V .60 Hz Frequency 60 Hz Commercial conditions Technical offer composition : Design and performances datas of turbine and generator Short description of components and their features List of tests of draft of quality plan Layout drawings with weights and dimensions Economical FOB Price in USA $ currency including ocean packing tests on workshop and relevant certification detailled engineering with layout dwgs, technical spec, manuals, list of electrical loads, etc Supervision to be quoted on daily tariff excluding board and Lodging, local entry permits, local transportation Delivery time: to be quoted including engineering, supply,and FOB transport, Erection period please let us have an estimation Offer validity: December 30 -09 Payment. We propose 10 % down at subcontract signature 5 % at the engineering dwgs delivery, load list, turbine final performances 70 % by milestones during costruction in your factory, test an FOB delivery 15 % at the PAC and FAC certificates issuing date Area and sales mngr
- Germany
- 2012-01-08





